Armory Square Project (Conceptual Project)

At its April 25, 2017 public meeting, the Board of County Commissioners presented a new concept for the Armory Square project featuring a potential location for a new county office complex. Below is the concept layout. The plan was presented as part of a discussion on the county's Capital Improvement Plan in which funds for initiating the office complex project were advanced.

concept plan for armory square

The Calvert County Planning Commission reviewed conceptual drawings and traffic study information related to the Armory Square project at its Dec. 9, 2015 meeting. Below are the two conceptual drawings presented. Follow the drawings for larger versions. concept (PDF) Opens in new windowconcept 2 (PDF) Opens in new window







A consultant conducted a traffic study to gauge the effects of the Armory Square project. The study covered the intersections from Route 2/4 at Fox Run Boulevard to Route 402 (Dares Beach Road) and along Dares Beach Road through Armory Road to Fairground Road. Below are the traffic study documents.

Executive Summary (PDF)

Traffic Impact Analysis for Armory Square (PDF)

Level of Service/Lane Use Exhibits (PDF)

Traffic Study Videos

Below are videos demonstrating morning and evening traffic flows both before and after planned road improvements.

Morning Traffic Flow, Existing Conditions

Evening Traffic Flow, Existing Conditions


Evening Traffic Flow, Improved Conditions