Click to Home

Go To Search
RSSPrintEmailFacebook
Armory Square Project
The Calvert County Planning Commission reviewed conceptual drawings and traffic study information related to the Armory Square project at its Dec. 9, 2015 meeting. Below are the two conceptual drawings presented. Click the drawings for larger versions.
 concept 1  concept 2

A consultant conducted a traffic study to gauge the effects of the Armory Square project. The study covered the intersections from Route 2/4 at Fox Run Boulevard to Route 402 (Dares Beach Road) and along Dares Beach Road through Armory Road to Fairground Road. Below are the traffic study documents.

Executive Summary

Traffic Impact Analysis for Armory Square

Level of Service/Lane Use Exhibits


Traffic Study Videos
Below are videos demonstrating morning and evening traffic flows both before and after planned road improvements.

Morning Traffic Flow, Existing Conditions
Morning Traffic Flow, Improved Conditions
Evening Traffic Flow, Existing Conditions
Evening Traffic Flow, Improved Conditions

Media CenterCounty MapsShop Local